HunBo

Hubei - China
Información de HunBo

1,Easy
It is about 23-25kg/m2, light weight means only a single worker could move the Aluminum Formwork easily.
2,Efficient
The Aluminum Formwork System is jointed by the pin, it is two times fast than wood formwork to install and dismantle, so it could save more work and work time.
3,Saving
The Aluminum Formwork System supports early-dismantling application, the construction working cycle is 4-5 days per floor, it is effective for cost saving in human resource and construction management
The Aluminum Formwork can be re-used more than 300 times, the economic cost is very low of every time using.
4,Safety
The Aluminum Formwork system adopts the integrative design, it could load 30-40kn/ m2, which could reduce the safety loophole leaded by the construction and materials.
5,High quality of construction.
The aluminum formwork is made by extrusion process, it makes the concrete surface flat,smooth. No need heavy backing plaster, effectively for plaster cost saving.
6,Environment friendly
The aluminum material of the formwork could also be recovered after useless, it avoids the waste.
7,Clean
Different with the wood formwork, there is no wood panel,fragment and other waste in the construction area using the aluminum formwork.
8,Widely scope of application:
The Aluminum Formwork System is suited for application of walls, beams, floors, windows, columns, etc.

Nombre de la empresa:
HunBo
Dirección Fiscal:
China Hubei
Localidad:
xingang dadao 41
Provincia:
Hubei
País:
China
Formas de pago aceptadas:
A convenir
Proveedores destacados

Aceros Man

Aceros Man suministra Aceros Negros, Galvanizados y Estructurales: PTR, Polin monten, Perfil Tubular, Tubo, vigas IPR, H.S.S. , Lamina Acanalada para Techados; Galvanizada y Pintro. Lamina Losacero...